Sunday was another gorgeous day. Eighty four degrees which is around 35 degrees above normal! The goal was to complete the piping to the veggie filter, from the waterfall box and for the overflow line. Before I could do the one from the overflow line, I had to cut a notch out of the concrete collar. The notch is about 2.5 inches deep and about 14 inches long. In other words ITS SMALL!
It took me five bleeping hours! Yes five. I attacked it with a sawzall, chisels and a circulating saw. Five hours later the little channel for the overflow pipe is done. Was I kicking myself for forgetting to put this in when the concrete was wet? You bet I was, lol. This was messy painful business. My husband was watching me and told me that my ratio of whacks to the chisel to whacks to my hand was roughly 4:1. Now you know why it took me five hours.
The only other thing complete was the planting of six pansies, the watering of the tomato babies and the ordering of some organic mosquito control tablets. Oh well, the forecast for the rest of the week is good too.
1 comment:
Thanks for stopping by. Your pond looks really good. Cant wait to see it finished!
Post a Comment